Application no.: BDB/73759 (map)
Site Reference: BA060
Location: Mortimer Quarry, to the West of the Village of Mortimer West End, Adjacent to the C90 Welshman's Road, Mortimer West End, Basingstoke
Proposal: Extension to sand and gravel workings at Mortimer Quarry into land know as Benyon's Inclosure, with restoration to commercial forestry and biodiversity, a temporary conveyor gantry crossing of Welshman's road, retention of existing quarry plant site and associated development including construction of additional silt lagoons with restoration to commercial forestry and biodiversity
Received: 10/01/2011
Validated: 10/01/2011
Start of Public Consultation: 10/01/2011
Public Consultation Expiry: 03/03/2011
Decision: Granted subject to legal agreement
Appeal Status: Appeal not lodged
Case Officer: Julia Davey
Case Officer Telephone: 01962 846732
Contact e-mail: planning@hants.gov.uk
Agent’s Name: Scott Wilson Ltd
Agent’s Address: Royal Court
Basil Close
Chesterfield
Derbyshire
Applicant’s Name: Hanson Aggregates
Applicant’s Address: 20/20 Industrial Estate
St Laurence Avenue
Allington
Maidstone
Kent
Attachments:  

Application Form

Supporting Statement

(Add) Supplementary Information (June 2011)

Applicants letter dated 2 September 2011

SS 001 Site Location Plan

SS 002 Location Area Plan

SS 003 Planning Application Boundary and Land Ownership Plan

SS 004 Local Land Designations and Public Rights of Way Plan

SS 005 Habitat Survey Plan

SS 006 Local Geological Plan

SS 007RevA Local Surface Water Features Plan (June 2011)

SS 008 RevB Phasing Plan (Sept 2011)

SS 009 Site Layout Aerial Plan

SS 010RevA Development Stage 1 Plan (June 2011)

SS 011RevA Development Stage 2 Plan (June 2011)

SS 012RevA Development Stage 3 Plan (June 2011)

SS 013Rev A Development Stage 4 Plan (June 2011)

SS 014Rev A Development Stage 5 Plan (June 2011)

SS 015Rev A Development Stage 6 Plan (June 2011)

SS 016Rev Development Stage 7 Plan (June 2011)

SS 017RevA Development Stage 8 Plan (June 2011)

SS 018Rev A Restoration Master Plan (June 2011)

SS 019 Sections to Watercourses Plan

MTR001Rev A Proposed Conveyor Bridge Accross Welsmans Road Plan (June 2011)

SS021A Welshman's Road Landscape Detail Plan (June 2011)

SS 022A Pinelands Local Landscape Detail Plan (June 2011)

SS 023 Pond Design (Restoration/Habitat Detail Omitted) Plan

SS 024Rev A Proposed Water Minitoring Points Plan (June 2011)

SS 025 Restoration Soils Profiles Plan

SS 026Rev A Geological Resource Plan (June 2011)

SS 027 Eastern Extension Aerial Image Plan

SS 028 Eastern Extension Layout Plan

SS 029 RevA Eastern Extension Restoration Plan (June 2011)

SS 030RevA Southern Extension Alternative Habitat Creation Plan (June 2011)

Non Technical Summary

Non Technical Summary - Site Location Plan

Non Technical Summary -Location Area Plan

Non Technical Summary - Application Boundar and Landownership Plan

Non Technical Summary - Southern Extension Site Layout Aerial

Non Technical Summary - Eastern Extension Aerial Image

Non Technical Summary - Eastern Extension Site Layout

Non Technical Summary - Southern Extension Phasing Plan

Non Technical Summary - Southern Extension Restoration Master Plan

Non Technical Summary - Eastern Extension Restoration Plan

Environmental Statement

Environmental Statement - Appendix A Landscape and Visual Impact

Environmental Statement -Appendix A - Site Landscape and Visual Context Plan

Environmental Statement -Appendix A - Landform Context Plan

Environmental Statement -Appendix A - Landscape Character Assessments Plan

Environmental Statement -Appendix A - Site Specific/Local Landscape Character Plan

Environmental Statement -Appendix A - Photoviewpoints and Zone of Theoretical Visibility P

Environmental Statement -Appendix A - Photoviewpoints 1-3

Environmental Statement -Appendix A - Photoviewpoints 4-6

Environmental Stayement -Appendix A -Photoviewpoints 7-9

Environmental Statement -Appendix A -Photoviewpoints 10-12

Environmental Statement -Appendix A - Restoration Masterplan Consultation Draft (Design Dr

(Add) Public RoW No. 9 Typical Sections Plan (June 2011)

Environmental Statement - Appendix B Natural Heritage and Biodiverity

(Add)Addendum to Appendix B Natural Heritage & Biodiversity (June 2011)

(Add) Addendum to Appendix B1 Biodidiversity Mitigation, Management & Monitoring Strategy

Environmental Statement - Appendix B1 Preliminary Ecological Survey Report

Environmental Statement - Appendix B2 Phase 2 Botanical Survey National Vegetation Classif

Environmental Statement - Appendix B3 Phase 2 Botanical Survey National Vegetation Classif

Environmental Statement -Appendix B4 Bat Survey Report 2009

Environmental Statement - Appendix B5 Bat Survey Report 2010

Environmental Statement - Appendix B6 Dormouse Report

Environmental Statement -Appendix B10 Badger Survey

Environmental Statement - Appendix B7 Breeding Bird Survey

Environmental Statement - Appendix B8 Reptile Survey Report 2009

Environmental Statement - Appendix B9 Benyons Reptiles

Environmental Statement - Appendix B11 Invertebrate Report

Environmental Statement - Appendix B12 Biodiversity Mitigation Strategy

Environmental Statement - Figure B1 - Site Context Plan

Environmental Statement - Figure B2 - Reptile Refugia Locations Plan

Environmental Statement - Figure B3 - Designated Sites Map

Environmental Statement - Figure B4 - Phase 1 Habitat Map

Environmental Statement - Figure B5 - Bats Plan

Environmental Statement - Figure B6 - Bat Roost Potential Plan

Environmental Statement - Figure B7 - Badger Survey Results Plan

Environmental Statement - Figure B8 - Alternative Habitat Creation Plan

Environmental Statement - Appendix C Hydrogeology

(Add) Addendum Appendix C Hydrogeological & Hydrological Assessment (June 2011)

Environmental Statement - Appendix C -Appendix A Envirocheck Report

Environmental Statement - Appendix C - Appendix B Figure HRA1

Environmental Statement - Appendix C -Appendix C Water Data Report

(Add) Flood Risk Report (June 2011)

(Add) Flood Risk Report - Appendix A (June 2011)

Environmental Statement - Appendix D- Noise

(Add) Addendum to Appendix D - Noise (June 2011)

(Add) Addendum to Appendix D - Noise (Sept 2011)

Environmental Statement - Appendix D - Figure D1 Noise Monitoring Locations Plan

Environmental Statement - Appendix D - Figure D2 Mineral Extraction from Phase 1 Plan

Environmental Statement - Appendix D - Figure D3 Mineral Extraction from Phase 2

Environmental Statement - Appendix D - Figure D4 Mineral Extraction from Phase 6 Plan

Environmental Statement - Appendix D - Figure D5 Mineral Extraction from Phase 7 Plan

Environmental Statement - Appendix D - Figure D6 Mineral Extraction from Phase 8 Plan

Environmental Statement - Appendix E Archaeology and Cultural Heritage

Environmental Statement - Appendix E - Appendix 4 Scoping Response

Environmental Statement - Appendix E - Figure E.1 Location of Cultural Heritage Assets Pla

Environmental Statement - Appendix E - Appendix 1 Archaeological Desk Based Assessment

Environmental Statement - Appendix E - Appendix 2 Woodland Survey

Environmental Statement - Appendix E- Appendix 3 Comparative Study

Environmental Statement - Appendix F - Transport

(Add) Addendum to Appendix F - Transport (June 11)

Environmental Statement - Appendix G - Air Quality and Dust

(Add) Addendum to Appendix G - Air Quality (June 2011)

Environmental Statement - ES.001 Location

Environmental Statement - ES.002 Location Area

Environmental Statement - ES.003 Land Ownership and Planning Boundary

Environmental Statement - ES.004 Local Land Designations Footpaths

Environmental Statement - ES.005 Phase 1 Habitat Survey

Environmental Statement - ES.006 Local Geological Plan

Environmental Statement - ES.007 Local Surface Water Features

Environmental Statement - ES.008 Southern Extension Phasing

Environmental Statement - ES.009 Southern Extension Aerial

Environmental Statement - ES.010 Southern Extension Phase 1

Environmental Statement - ES.011 Southern Extension Phase 2

Environmental Statement - ES.012 Southern Extension Phase 3

Environmental Statement - ES.013 Southern Extension Phase 4

Environmental Statement - ES.014 Southern Extension Phase 5

Environmental Statement - ES.015 Southern Extension Phase 6

Environmental Statement - ES.016 Southern Extension Phase 7

Environmental Statement - ES.017 Southern Extension Phase 8

Environmental Statement - ES.018 Southern Extension Restoration Master

Environmental Statement - ES.019 Sections to Watercourses

Environmental Statement - ES.021 Welshman's Road Landscaping Detail

Environmental Statement - ES.022 Pinelands Landscaping Detail

Environmental Statement - ES.023 Pond Design

Environmental Statement - ES.024 Proposed Water Monitoring Points

Environmental Statement - ES.025 Soil Restoration Profiles

Environmental Statement - ES.026 Geological Resource Plan

Environmental Statement - ES.027 Eastern Extension Aerial Image

Environmental Statement - ES.028 Eastern Extension Aerial Image

Environmental Statement - ES.029Rev A Eastern Extension Phasing (June 2011)

Environmental Statement - ES.030 Southern Extension Alternative Habitat Creation

Environmental Statement - MTR001 A1 Gantry Layout (ES.020)

(Add) MTR/002 Proposed Feed Hopper & Conveyor Bridge Accross Welshmans Road Plan (June 201

(Add) LA001 S106 Public RoW Routes Plan (Sept 2011)

(Add) LA002 S106 Lorry Routes Plan (Sept 2011)

(Add) LA003 S016 Site Entrance Extend of Bound Surface Plan (Sept 2011)

(Add) PS002 Proposed Conveyor Culvert Option B Plan (Sept 2011)

(Add) PS003 90m Standoff Illustration Plan (Sept 2011)

(Add) PS004 Gantry Photomontages (Sept 2011)