Strategic Planning

All Applications

<- 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16+ ->
Application No. Site Reference Location Proposal
HCC/2015/0139 HVE025 Park Community School, Middle Park Way, Havant Hampshire PO9 4BU Addition of a 2-4yrs modular nursery, and conversion of an existing building into a 0-2yrs nursery
15/01349/CC3 BAE055 Marnel Infant & Junior Schools, Shetland Road, Basingstoke Hampshire RG24 9PT 1 Form of Entry Extension, Internal Alterations and External Works to both Schools to expand from 3 Form Entry to 4 Form Entry
HCC/2015/0127 EAE044 Fryern Infant School, Oakmount Road, Chandler's Ford, Hampshire SO53 2LN Installation of a Double temporary modular classroom and additional hard playground
APP/15/00390 HV048 Conroys Recycle Facility, Harts Farm Way, Havant Hampshire PO9 1JN Continued use of land as utilities storage depot and excavation waste recycling facility for recycling of inert waste arising as a result of the Southern Gas Mains Replacement Programme
HCC/2015/0116 HRE025 Hook Infant School, Church View, Hook, Hampshire RG27 9NR Expansion of Hook Infant and Junior Schools to 4 Form Entry capacity with two new buildings, an extension to the Junior School Hall and associated external works including car parking and a new access road from Ravenscroft, the adjacent Hook Community Centre
15/00921/HCC HR085 Eversley Haulage Park, Brickhouse Hill, Eversley Hook RG27 0PZ Extension of the existing waste recycling and transfer site (by 0.2ha) to accommodate the erection of a two storey office building (Class B1) (floorspace of approximately 1,273m2 gross), and associated ancillary works (car parking, bin store and cycle parking), and construction of a lorry parking area within the existing site
HCC/2015/0117 HRG010 Wyndhams Pool, Cricket Hill Lane Yateley Hampshire GU46 6BB Repairs to Wyndham's Dam at Wyndham's Pool - within an SSSI
15/10539 NF091 Land at Bleak Hill I and II (Hamer Warren Quarry) Somerley Variation of conditions 1, 10, 12 & 19 of planning permission 14/10309 to revise the working and restoration schemes
15/10518 NF097 Land at Ellingham Farm, North Somerley, Ringwood Variation of condition 1 of planning permission 11/98107 for a time limited extension for the restoration of Ellingham Quarry
15/01119/CC3 BAE063 Merton Infant & Junior Schools, Romsey Close, Basingstoke Hampshire RG24 9HB Proposed Highway alterations to improve the vehicle turning facilities at the end of Tintern Close along with additional publically accessible parking, the works are associated with planning application No 14/00465/CC3, Expansion of Merton Infant & Junior Schools
15/01130/CMA BA121 Composting Facility at Southley Farm, Southley Farm Road, Southley, Overton RG25 3DR Variation of condition 9 of planning permission BDB/71071 (to allow the export of compost)
15/01000/CC3 BAE047 Fort Hill Community School, Kenilworth Road, Basingstoke, Hampshire, RG23 8JQ Fencing works to portion of northern location with higher metal fencing and provision of metal fencing to section of southern location, retrospective planning permission for the section of which a fence has been erected but does not have planning permission (section AB on existing application plan)
HCC/2015/0098 HRE032 Greenfields Junior School, Green Lane, Hartley Wintney Hook RG27 8DQ 4 classroom extension to existing school together with ancillary accommodation and the creation of a new school entrance
15/01125/CMA BA054 Rookery Farm Lane, Monk Sherborne Hampshire RG26 5HW Planning Application for the development of a picking station and associated plant with the variation of conditions 10 (Site Layout) and 11 (to allow screening activities)
15/00974/CC3 BAE038 Great Binfields Primary School, Binfields Farm Lane, Chineham, Hampshire RG24 8AJ It is proposed to expand the existing 1 form entry primary school by 210 pupil places to create a 2 form entry school. The expansion will include additional play areas and the enlargement and relocation of the existing staff car park.
15/00188/HCC RME029 Tower Hill Community Primary School, Fowler Road, Farnborough Hampshire GU14 0BW Construction of a single storey stand alone extension to allow the school to expand to a 2 Form Entry Primary School. A number of internal alterations to the existing school will be carried out to facilitate the expansion. Additional parking spaces will also be provided to accommodate the increased staff numbers.
15/00661/HCC HRE031 Oakwood School, Church Lane, Hartley Wintney, Hook RG27 8DY A single storey 4 classroom extension with associated ancillary spaces, WCs, storage, landscaping works and reinstatement of existing photovoltaic
P/15/0242/CC FAE014 Portchester Community School, White Hart Lane, Fareham Hampshire PO16 9BD Removal and replacement of the external envelope of the Rosla (Technology) block @ Portchester Community School complete associated with internal refurbishment
15/00826/CMAS TV226 Roke Manor Quarry, Shootash , Romsey Hampshire SO51 6GA Planning application for the re-alignment of the haul road crossing relating to mineral working
S/15/76180 EAE024 St James Church of England Primary School, Moorgreen Road, West End Hampshire SO30 3EG Installation of a double temporary modular classroom with associated hard and soft landscaping
<- 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16+ ->