Strategic Planning

All Applications

<- 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16+ ->
Application No. Site Reference Location Proposal
HCC/2015/0225 BAE029 Maple Ridge School, Maple Crescent~~Basingstoke, Hampshire RG21 5SX Temporary double modular classroom
HCC/2015/0216 HVE016 Trosnant Infant and Junior School, Stockheath Lane, Havant Hampshire PO9 3BD Temporary Double Modular Classroom
HCC/2015/0215 HRE035 Tweseldown Infant School, Nepal Gardens, Church Crookham Fleet GU52 8LL Temporary double modular classroom with 6 additional car parking spaces
HCC/2015/0214 HRE017 Fleet Infants School, Velmead Road, Fleet, Hampshire GU52 7LQ Relocation of an existing single temporary classroom, installation of a new double temporary classroom and associated outdoor activity areas
APP/15/00538 HVE023 Paddock north of Woodcroft Primary School, Havant Hampshire Change of use from a paddock to a grass playing field
20103/004 EHE046 Clanfield Early Years - Petersgate Infant School, Green Lane, Clanfield Waterlooville Hants, PO8 0JU 3 bay extension to a temporary modular nursery building
P/15/0484/CC FAS005 26 Catisfield Road, Fareham, Hampshire PO15 5QF Demolition of existing family centre and erection of a new detached two storey 6no bedroom 'Family Unit' sized children's home, serving four children, and associated building works
P/15/0477/CC FA025 Down End Quarry, Down End Road, Fareham, Hampshire PO16 8TR Variation of condition 5 of planning permission P/14/0585/CC (increase HGV movements)
HCC/2015/0190 EAE006 Wildern School, Wildern Lane, Hedge End Hampshire SO30 4EJ 3 temporary double modular classrooms with associated landscaping
15/01659/CC3 BAE018 Whitchurch C E Primary School, Daniel Road, Whitchurch, Hampshire RG28 7LS Installation of a double temporary classroom
15/01693/CC3 BAE012 Kings Furlong Infant School and Nursery, Upper Chestnut Drive, Basingstoke Hampshire RG21 8YJ Installation of a double temporary modular classroom
15/01014/HCS WRE006 The Westgate School, Cheriton Road, Winchester, Hampshire SO22 5AZ Tarmac play surface 29.350M x 10.680M and a 1.2m wide path, Play surface to have 1.5 m high Chain link fence with gates
S/15/76450 EAR003 Netley Chapel, Royal Victoria Country Park, Netley Abbey, Hampshire SO31 5GA The proposed works include, repair and conservation works to the chapel, demolition of modern unsympathetic additions, a series of internal alterations to improve access for visitors and a new build extension to provide the necessary ancillary facilities for the running of the chapel
S/15/76521 EAR003 Netley Chapel, Royal Victoria Country Park, Netley Abbey, Hampshire SO31 5GA (Listed Builiding Application) The proposed works include, repair and conservation works to the chapel, demolition of modern unsympathetic additions, a series of internal alterations to improve access for visitors and a new build extension to provide the necessary ancillary facilities for the running of the chapel
APP/15/00428 HVE025 Park Community School, Middle Park Way, Havant Hampshire PO9 4BU Addition of a 2-4yrs modular nursery, and conversion of an existing building into a 0-2yrs nursery
15/01349/CC3 BAE055 Marnel Infant & Junior Schools, Shetland Road, Basingstoke Hampshire RG24 9PT 1 Form of Entry Extension, Internal Alterations and External Works to both Schools to expand from 3 Form Entry to 4 Form Entry
S/15/76385 EAE044 Fryern Infant School, Oakmount Road, Chandler's Ford, Hampshire SO53 2LN Installation of a Double temporary modular classroom and additional hard playground
15/00885/HCC HRE025 Hook Infant School, Church View, Hook, Hampshire RG27 9NR Expansion of Hook Infant and Junior Schools to 4 Form Entry capacity with two new buildings, an extension to the Junior School Hall and associated external works including car parking and a new access road from Ravenscroft, the adjacent Hook Community Centre
APP/15/00390 HV048 Conroys Recycle Facility, Harts Farm Way, Havant Hampshire PO9 1JN Continued use of land as utilities storage depot and excavation waste recycling facility for recycling of inert waste arising as a result of the Southern Gas Mains Replacement Programme
15/00921/HCC HR085 Eversley Haulage Park, Brickhouse Hill, Eversley Hook RG27 0PZ Extension of the existing waste recycling and transfer site (by 0.2ha) to accommodate the erection of a two storey office building (Class B1) (floorspace of approximately 1,273m2 gross), and associated ancillary works (car parking, bin store and cycle parking), and construction of a lorry parking area within the existing site
<- 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16+ ->