Strategic Planning

All Applications in Hart

<- 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16+ ->
Application No. Site Reference Location Proposal
15/01787/HCC HR094 Land Adjacent to New Farm, Froyle Lane, South Warnborough, Hook RG29 1SH Addition of weighbridge and portable office/welfare units and variation of condition 14 (to allow external lighting) and conditions 5, 6 & 15 (amendment to site layout) of permission 13/00906/CMA
15/01355/HCC HRG011 Basingstoke Canal and towing path, Near Dower House, Church Lane, Dogmersfield RG27 8TA Restoration of the Basingstoke Canal channel and towpath following a landslide including engineering work to prevent further slips from occurring
15/01272/HCC HRE035 Tweseldown Infant School, Nepal Gardens, Church Crookham Fleet GU52 8LL Temporary double modular classroom with 6 additional car parking spaces
15/01245/HCC HRE017 Fleet Infants School, Velmead Road, Fleet, Hampshire GU52 7LQ Relocation of an existing single temporary classroom, installation of a new double temporary classroom and associated outdoor activity areas
15/00885/HCC HRE025 Hook Infant School, Church View, Hook, Hampshire RG27 9NR Expansion of Hook Infant and Junior Schools to 4 Form Entry capacity with two new buildings, an extension to the Junior School Hall and associated external works including car parking and a new access road from Ravenscroft, the adjacent Hook Community Centre
15/00921/HCC HR085 Eversley Haulage Park, Brickhouse Hill, Eversley Hook RG27 0PZ Extension of the existing waste recycling and transfer site (by 0.2ha) to accommodate the erection of a two storey office building (Class B1) (floorspace of approximately 1,273m2 gross), and associated ancillary works (car parking, bin store and cycle parking), and construction of a lorry parking area within the existing site
15/00877/HCC HRG010 Wyndhams Pool, Cricket Hill Lane Yateley Hampshire GU46 6BB Repairs to Wyndham's Dam at Wyndham's Pool - within an SSSI
15/00703/HCC HRE032 Greenfields Junior School, Green Lane, Hartley Wintney Hook RG27 8DQ 4 classroom extension to existing school together with ancillary accommodation and the creation of a new school entrance
15/00661/HCC HRE031 Oakwood School, Church Lane, Hartley Wintney, Hook RG27 8DY A single storey 4 classroom extension with associated ancillary spaces, WCs, storage, landscaping works and reinstatement of existing photovoltaic
15/00593/HCC HRE009 Long Sutton Primary School, The Street, Long Sutton, Hook RG29 1ST Installation of a double temporary modular classroom with associated hard and soft landscaping
15/00475/HCC HRE024 Elvetham Heath Primary School, The Key, Fleet, Hampshire GU51 1DP single storey extension to school kitchen and provision of replacement bin enclosure to keep school bins within
15/00029/HCCRG3 HRE024 Elvetham Heath Primary School, The Key, Fleet Hampshire GU51 1DP Install open sided canopy to provide covered play for Reception class pupils
14/02156/CMA HR101 The Barn Workshop, Stapeley Down Farm, Long Lane, Odiham, Hook, RG29 1JF The proposed development is the formation of an earth bund for ecological and environmental reasons, in order to increase biodiversity in the area and enhance the environment, it is also so the farm can comply with EU Regulations on farming
14/01791/CMA HR102 Stapeley Manor Farm, Long Lane, Odiham, Hook Hampshire RG29 1JE Lawful Development Certificate Land used for recycling soils and inert construction waste, and distribution of imported aggregate
14/01623/HCCRG3 HRE003 Yateley School, School Lane, Yateley Hampshire GU46 6NW Re-cladding of existing 3 storey and single storey Scola Block (A Block),~ comprising new aluminium doors and windows, insulated brick panels and rendered insulation panels to elevations New felt built-up flat roof covering.
14/01504/CMA HR034 Biffa Waste Services, Star Hill Sawmills Star Hill, Hartley Wintney, Hook RG27 8BP Retrospective change to the use of the building from storage and transfer of recycling materials to include the parking of vehicles and the storage and transfer of recycling materials
14/01287/HCCRG3 HRE031 Oakwood Community Play Group, Church Lane, Hartley Wintney Hook~~RG27 8DY Single modular classroom with associated hard and soft landscaping
14/01144/HCCRG3 HRE035 The New Tweseldown Infant School, Part of the Former Elizabeth Barracks, Sandy Lane, Church Crookham, Fleet GU13 0BJ Single modular classroom with associated soft and hard landscaping
14/01158/HCCRG3 HRE031 Oakwood School, Church Lane, Hartley Wintney, Hook RG27 8DY Single modular classroom with associated soft and hard landscaping
14/00863/CMA HR073 Humbly Grove Energy, Weston Common, The Avenue, Lasham, Hants GU34 5SY Variation of condition 5 of planning permission 00/00024/CMA to enable the movement of oil from Weston Common by road tanker
<- 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16+ ->