County Planning

All Applications in Winchester

<- 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16+ ->
Application No. Site Reference Location Proposal
11/01086/HCS WR081 Yeoman Asphalt, Botley Goods Yard, Station Hill, Botley SO30 2DN Relocation of existing operational portacabin containing site managers office and meeting room, from the northern weighbridge exit to the southern weighbridge entrance
11/01071/HCS WR220 DASE Engineering, Garfield Road, Bishops Waltham, Hampshire SO32 1AT (Lawful Development Certificate) The use of the site for the storage of scrap vehicles and metals and for the sorting and compacting of metals
11/01021/HCS WRE007 Perins School & Community Sports College, Pound Hill, Alresford, Hampshire SO24 9BS Continued siting for 2 double temporary modular buildings (Ref. 713326 & 713327) on site for a further seven years until 31st August 2018
11/00465/HCS WR224 DSTL, Portsdown Main Site, Portsdown Hill Road, Fareham, Hants PO17 6AR Importation and storage of concrete waste to blend with on site demolition material to produce secondary aggregate for a period of two years
11/00452/HCS WR222 Land off Greenwood Lane, Durley, Southampton SO32 2AP Extraction of remaining sand reserves from former sandpit with restoration by infilling to existing surrounding levels for leisure/amenity use
11/00376/HCS WRE017 Cheriton Primary School, Cheriton, Alresford SO24 0QA (Development in South Downs National Park Area) Works are proposed to replace the tile hanging with horizontal cedar cladding
11/00181/HCS WRE054 Lanterns Children Centre, Bereweeke Road, Winchester Hampshire SO22 6AJ Removal of Condition No. 14 of Planning Approval W14917/03 and 03/01999/H at Lanterns Early Years Centre in respect of the swimming pool and Sports Hall at Winton House which was to be refurbished and made available for use by Westgate School and the Community
11/00136/HCS WR192 Units D and E, Pegham Industrial Estate, Laveys Lane, Titchfield, Hampshire PO15 6SD Construction of new building to house Combined Heat & Power plant.
11/00144/HCS WRE006 The Westgate School, Cheriton Road, Winchester Hampshire SO22 5AZ Classroom Extension and Link Corridor to existing
11/00117/HCS WR183 Former Depot, Bar End Road, Winchester Hampshire Extension of time for Condition 3 of Planning Approval 05/03019/HCS W08495/15 for continued use as a car park for a further two years until 31 March 2013
11/00116/HCS WRG031 Trilogy, Concorde Way, Fareham Hampshire PO15 5RL Erection of a new fence
10/03183/FUL WR209 Avington Pumping Station, Avington House, Avington, Winchester SO21 1DB (Development in SDNP Area) The proposed development is to provide a wastewater pumping station wet well and transfer main dealing with the wastewater from Avington
10/02847/HCS WRE032 St Bede C of E Primary School, Gordon Road, Winchester, Hampshire SO23 7DD Two storey side extension to school - 3 Classrooms, boys WC, girls WC, accessible WC, Hall storage space, one to one rooms
10/02722/FUL WR223 Gregory Recoverys, Unit 3, Claylands Road, Bishops Waltham, SO32 1BH Demolition of existing buildings and reconstruction of buildings on site for the processing of non ferrous metals
10/02645/HCS WR018 Transfer Plant, Poles Lane, Otterbourne WINCHESTER SO21 2EA Variation of condition 2 of planning permission 09/02391/HCS to enable the erection of a replacement green waste transfer bay
10/02625/HCS WR210 Four Dells Farm, Poles Lane, Otterbourne, Winchester SO21 2DY The development is for a small three bay gully waste de-watering facility. Gully Waste generated from cleaning the highway network is de-watered and liquid and solid waste is forwarded on to facilities which are permitted with the Environment Agency for recycling
10/02588/HCS WR221 DSTL, Portdown Main Site, Portsdown Hill road, Fareham PO17 6AR Importation and storage of concrete waste to blend with on site demolition material to produce secondary aggregate for a period of two years
10/02304/HCS WR191 The Pebbles, Southwick Road, North Boarhunt, Nr Wickham, Hants Po17 6JF A retrospective application for change of use from agricultural to green waste recycling, this will increase the area used from 0.2 hectare to 0.6 hectare, to include three polytunnels for dry storage of recycled materials
10/02068/HCS WRE015 Shepherds Down School, Compton, Winchester SO21 2AJ Erection of a canopy (overall size 28.50m long x 4.00m long x 3.00m high to ridge)
10/02032/HCS WRG015 South Stoke Farm House, Kings Worthy, Winchester Farm complex improvements to roof over existing open cattle years and proposed lean-to for livestock use
<- 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16+ ->