Strategic Planning

Recent Decisions

Below is a list (updated daily) of planning applications that have been determined for mineral and waste and County Council developments within the last three months. To view more information about an application please click the application number (highlighted in blue).

<- 1 | 2 | 3 ->
Application No. Site Reference Location Proposal
15/01953/CC3 BAE049 North Waltham Primary School, Church Road, North Waltham Hampshire RG25 2BL (Listed Building Application) Careful dismantling and rebuilding of defective chimney stack
15/01541/HCC3S TVE019 North Baddesley County Infant School, Botley Road, North Baddesley, Hampshire SO52 9EE Temporary Single Modular Classroom
15/01367/HCC3N TVE022 Hurstbourne Tarrant Church of England Primary School, Church Street, Hurstbourne Tarrant Hampshire SP11 0AX Replacement of existing single temporary modular classroom with another single temporary modular classroom
15/00877/HCC HRG010 Wyndhams Pool, Cricket Hill Lane Yateley Hampshire GU46 6BB Repairs to Wyndham's Dam at Wyndham's Pool - within an SSSI
S/15/76521 EAR003 Netley Chapel, Royal Victoria Country Park, Netley Abbey, Hampshire SO31 5GA (Listed Builiding Application) The proposed works include, repair and conservation works to the chapel, demolition of modern unsympathetic additions, a series of internal alterations to improve access for visitors and a new build extension to provide the necessary ancillary facilities for the running of the chapel
15/01355/HCC HRG011 Basingstoke Canal and towing path, Near Dower House, Church Lane, Dogmersfield RG27 8TA Restoration of the Basingstoke Canal channel and towpath following a landslide including engineering work to prevent further slips from occurring
S/15/76115 EA027 Netley Farm Landfill, Old Portsmouth Road, Bursledon Hampshire SO31 8GD Remediation of settlement of former Netley Landfill involving importation and screening of subsoils
P/15/0538/CC FAE033 Red Barn County Primary School, Linden Lea, Fareham Hampshire PO16 8HJ One single temporary modular classroom, one single modular community room plus a new bin store
15/01922/CC3 BAE029 Maple Ridge School, Maple Crescent, Basingstoke, Hampshire RG21 5SX Temporary double modular classroom
15/01014/HCS WRE006 The Westgate School, Cheriton Road, Winchester, Hampshire SO22 5AZ Tarmac play surface 29.350M x 10.680M and a 1.2m wide path, Play surface to have 1.5 m high Chain link fence with gates
APP/15/00561 HVE016 Trosnant Infant and Junior School, Stockheath Lane, Havant Hampshire PO9 3BD Temporary Double Modular Classroom
15/01245/HCC HRE017 Fleet Infants School, Velmead Road, Fleet, Hampshire GU52 7LQ Relocation of an existing single temporary classroom, installation of a new double temporary classroom and associated outdoor activity areas
S/15/76450 EAR003 Netley Chapel, Royal Victoria Country Park, Netley Abbey, Hampshire SO31 5GA The proposed works include, repair and conservation works to the chapel, demolition of modern unsympathetic additions, a series of internal alterations to improve access for visitors and a new build extension to provide the necessary ancillary facilities for the running of the chapel
APP/15/00390 HV048 Conroys Recycling Facility, Harts Farm Way, Havant Hampshire PO9 1JN Continued use of land as utilities storage depot and excavation waste recycling facility for recycling of inert waste arising as a result of the Southern Gas Mains Replacement Programme
29275/007 EHE011 Bentley C of E Primary School, School Lane, Bentley, Farnham, Hampshire GU10 5JP Extention to existing staff parking
15/00921/HCC HR085 Eversley Haulage Park, Brickhouse Hill, Eversley Hook RG27 0PZ Extension of the existing waste recycling and transfer site (by 0.2ha) to accommodate the erection of a two storey office building (Class B1) (floorspace of approximately 1,273m2 gross), and associated ancillary works (car parking, bin store and cycle parking), and construction of a lorry parking area within the existing site
S/15/76532 EAE006 Wildern School, Wildern Lane, Hedge End Hampshire SO30 4EJ 3 temporary double modular classrooms with associated landscaping
15/01693/CC3 BAE012 Kings Furlong Infant School and Nursery, Upper Chestnut Drive, Basingstoke Hampshire RG21 8YJ Installation of a double temporary modular classroom
15/01272/HCC HRE035 Tweseldown Infant School, Nepal Gardens, Church Crookham Fleet GU52 8LL Temporary double modular classroom with 6 additional car parking spaces
15/01659/CC3 BAE018 Whitchurch C E Primary School, Daniel Road, Whitchurch, Hampshire RG28 7LS Installation of a double temporary classroom
<- 1 | 2 | 3 ->