Strategic Planning

Recent Decisions

Below is a list (updated daily) of planning applications that have been determined for mineral and waste and County Council developments within the last three months. To view more information about an application please click the application number (highlighted in blue).

<- 1 | 2 | 3 ->
Application No. Site Reference Location Proposal
S/15/76385 EAE044 Fryern Infant School, Oakmount Road, Chandler's Ford, Hampshire SO53 2LN Installation of a Double temporary modular classroom and additional hard playground
15/00826/CMAS TV226 Roke Manor Quarry, Shootash , Romsey Hampshire SO51 6GA Planning application for the re-alignment of the haul road crossing relating to mineral working
15/00074/HCC RM035 Land at Former Lafarge Site, Hollybush Lane, Aldershot Hampshire GU12 5QA Development of the site to provide an End of Life Treatment Facility, incorporating the existing hardstanding and perimeter screening. Including the provision of office accommodation and workshop (retrospective). The development also includes a new car park for private and public use, with a footpath along Hollybush Lane. together with landscaping and drainage works
14/01791/CMA HR102 Stapeley Manor Farm, Long Lane, Odiham, Hook Hampshire RG29 1JE Lawful Development Certificate Land used for recycling soils and inert construction waste, and distribution of imported aggregate
15/00703/HCC HRE032 Greenfields Junior School, Green Lane, Hartley Wintney Hook RG27 8DQ 4 classroom extension to existing school together with ancillary accommodation and the creation of a new school entrance
P/15/0145/CC FA025 Warren Farm WTS and MRF, Down End Road, Fareham Hampshire PO17 6AL Variation of conditions 3 and 10 of planning permission P/10/0848/MW to extend the operational hours
S/15/76180 EAE024 St James Church of England Primary School, Moorgreen Road, West End Hampshire SO30 3EG Installation of a double temporary modular classroom with associated hard and soft landscaping
S/15/76020 EA108 Knowle Lane, Fair Oak Variation of condition 1 (Timescales) of planning permission S/13/71991
15/00898/CC3 BAE012 Kings Furlong Infant School and Nursery, Upper Chestnut Drive, Basingstoke Hampshire RG21 8YJ Installation of a double temporary modular classroom with associated hard and soft landscaping
14/10437 NF268 Unit 4 Hardley Industrial Estate, Hythe, Southampton SO45 3NQ Waste transfer station for asbestos to rear of yard
15/00772/CC3 BAE057 Oakridge Infant School, Oakridge Road, Basingstoke Hampshire RG21 5RR Installation of a double temporary modular classroom with associated hard and soft landscaping
15/00593/HCC HRE009 Long Sutton Primary School, The Street, Long Sutton, Hook RG29 1ST Installation of a double temporary modular classroom with associated hard and soft landscaping
SCO/2014/0474 NF269 Land at Roeshot Request for a Scoping Opinion: minerals extraction and processing, concrete batching plant, importation and treatment of inert material to enable progressive restoration to mixed use of agriculture, heath and open space
P/15/0242/CC FAE014 Portchester Community School, White Hart Lane, Fareham Hampshire PO16 9BD Removal and replacement of the external envelope of the Rosla (Technology) block @ Portchester Community School complete associated with internal refurbishment
15/10301 NFE020 Poulner Infant School, North Poulner Road. Ringwood, Hampshire BH24 3LA Installation of a double temporary modular classroom with associated hard and soft landscaping
P/15/0241/CC FAE029 Baycroft School, Gosport Road, Stubbington Fareham PO14 2AE Re-roofing of part of school, addition of a an extension to the front entrance, creation of an accessible WC and the removal of an old water tower
15/01130/CMA BA121 Composting Facility at Southley Farm, Southley Farm Road, Southley, Overton RG25 3DR Variation of condition 9 of planning permission BDB/71071 (to allow the export of compost)
15/00006/CMAS TV066 RFSF Recycling, Bunny Lane, Timsbury Hampshire SO51 0PG Removal of an existing lean to building and replacement with a picking station including associated conveyors and containers, replacing an existing picking station with a larger unit, provision of concrete surfacing for aggregate storage, minor extension and relocation of the existing offices/mess rooms and revision of vehicle manoeuvring/car parking area with associated changes to approved Layout Drawing 396C/SL/2 (March 2011 as referenced in Condition 2 of Appeal Decision APP/Q1770/A/11/2161324
15/00843/CC3 BAE048 Aldworth Science College, Western Way, Basingstoke, Hampshire RG22 6HA Replacement Roof covering to main school hall roof
S/15/76169 EAE035 Quilley School of Engineering, Cherbourg Road, Eastleigh Hampshire SO50 5EL Re-roofing to the school hall, change of roofing material and appearance to the school
<- 1 | 2 | 3 ->