Highway Maintenance

Commuted Sums for the future maintenance of the highway

1.Introduction

The following policy for commuted sums for the future maintenance of the highway network was approved by the Executive Member for Environment on 23March 2007.

2.Relevant Legislation

Section 278 (3) and Section 38 (6) of the Highways Act 1980 enables a highway authority to seek commuted sums from developers.

3.Policy

3.1Hampshire County Council will require developers to pay a commuted sum towards maintenance of items that have a higher maintenance cost compared with conventional materials or items, or would not be required save for the development.

3.2Where appropriate, Section 278 and Section 38 Agreements will include provision for commuted sums towards maintenance.

3.3A schedule of items for which commuted sums will be sought from developers is shown in the Appendix.

3.4The requirement for commuted sums will be assessed for each site prior to the drafting of Section 278 and Section 38 Agreements.

APPENDIX

COMMUTED SUMS SCHEDULE OF ITEMS AND CHARGES

Item      Unit / Basis for Calculation      Notes

1. Unusual paving,surfacing and HFS       m2      1 off replacement cost

2.Traffic signals including Controlled Crossing       20% of Works cost      As existing policy

3.Illuminated Signs      Works cost      1 off replacement cost

4.Decorative- Non Standard lighting       Works cost      1 off replacement cost

5.Street Furniture      Works Cost      1 off replacement cost

6.Bus Shelters      Works Cost      1 off replacement cost

7.Structures including Culverts over 900 diameters , head walls,and retaining walls......20% of Works cost      Structures as described in Movement Access Streets and Spaces

8.Trees - New      Number      Based on Term Maintenance Contract (TMC)rates - average cost on likely operations over 25 years

9.Trees existing      Number      Based on TMC rates - average cost on likely operations over 25 years

10.Shrub beds / grass / landscaping      m2      Based on TMC rates - average cost on likely operations over 25 years

11.Soakaways       Works and Maintenance Cost       1 off replacement cost and average cost of 25 years maintenance based on TMC rates

12.Hydrobrakes       Works cost       1 off replacement cost

13.Petrol Interceptor      Works cost      1 off replacement cost

14.Pebble drains and Linear ditches      Works and Maintenance Cost      1 off replacement cost with average cost of 25 years maintenance based on TMC rates

Other items to be included in exceptional circumstances.

Version No 1.0

Effective 23/03/2007