Strategic Planning

All Applications in New Forest

<- 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16+ ->
Application No. Site Reference Location Proposal
07/91070 NFE051 Blackfield Primary School, Hampton Lane, Blackfield, near Fawley. Construction of 2 storey building to rear of site onto school field comprising multipurpose hall, changing rooms and toilets and 1st floor multipurpose room
07/92129 NF235 Hampshire Turf, Northern Access Road, Fawley Facility for resource recycling, recovery and transfer
07/90939 NF001 Pyros Environmental Limited, Charleston Road, Hardley, Hythe Application for Hazardous Substances Consent
07/92070 NFNP001 Pound Bottom Landfill Site, Forest Road, Salisbury Installation and operation of a landfill gas utilisation plant
07/90840 NF042 Efford Landfill, Milford Road, Lymington Retention of leachate treatment plant including change of use to allow importation of leachate
07/90814 NFE045 Pennington Infants School, Priestlands Road, Pennington, Lymington SO41 8HX Single storey Children's Centre with associated external works
07/90710 NF101 Ibsley Lake, Ellingham Drove, Ringwood Variation of condition 1 of planning permission 06/88522 to extend the time period
07/90724 NF242 Fordingbridge Sewage Treatment Works, Frog Lane, Fordingbridge Construction of a chemical dosing kiosk, a sludge drum thickener, polydosing, motor control centre kiosk and a pumping station motor control centre kiosk as part of a scheme to ensure future Environment Agency consents are met
07/90688 NF186 Ibsley Quarry, Land adjacent to Salisbury Road (A338), Ibsley, Near Ringwood, Hampshire Variation of Condition 2 of Permission No.79451 dated 04 May 2004 to extend the time period of sand and gravel extraction at Ibsley Quarry (Extension Site)
07/90518 NF229 HCC Depot, Jacobs Gutter Lane, Totton Hants SO40 9TQ Temporary office accommodation
07/91750 NF109 Holmsley Landfill Site, Black Lane, Thorney Hill, Bransgore Modification of planning condition (85070) to allow site to operate between 15 July to 30 September 2007
07/90463 NF256 40 Salisbury Street, Fordingbridge Install above ground glass reinforced plastic (GRP) control kiosk to house controls for proposed below ground sewer overflow chamber and pump discharge
07/90484 NF106 Sandy Field, Nea Farm, Somerley, Ringwood Temporary re-location of part of existing Somerley Park Golf Course from southern field of Nea Farm to Sandy Field in north west for a temporary period
07/90285 NF042 Pennington Wastewater Treatment Works (WTW), Off Milford Road, Lower Pennington, Lymington Construction of a Motor Control Centre (MCC) kisok
07/90177 NF252 Land at Newbourne Farm, Rockbourne, Fordingbridge Application for Certificate of Lawful use for processing green waste
07/90182 NF105 Blue Haze Landfill, Ringwood Road (B3081), Ringwood Temporary Waste Transfer Station
07/90183 NF105 Blue Haze Landfill, Ringwood Road (B3081), Ringwood Non compliance with condition 3 of planning permission No. 06/88024 for a revised phasing and restoration programme
07/90181 NF105 Blue Haze Landfill, Ringwood Road (B3081), Ringwood Formation of an incinerator bottom ash conditioning and process facility for a temporary period
SCR/2007/0106 NFNP001 Pound Bottom Landfill Site, Forest Road,~~Redlynch Request for screening opinion for application for landfill gas utilisation plant
07/91588 NFNP001 Pound Bottom Landfill Site, Forest Road, Redlynch, Salisbury Installation and operation of a leachate storage tank which will replace the current leachate lagoon
<- 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16+ ->