Strategic Planning

Recent Decisions

Below is a list (updated daily) of planning applications that have been determined for mineral and waste and County Council developments within the last three months. To view more information about an application please click the application number (highlighted in blue).

<- 1 | 2 | 3 ->
Application No. Site Reference Location Proposal
APP/15/00757 HV017 Farlington Redoubt, Portsdown Hill Road, Havant Hampshire PO6 1BW Application to vary condition 9 of planning permission 10/00141 (to increase permitted throughput)
15/02494/CC3 BAE047 Fort Hill Community School, Kenilworth Road, Basingstoke Hampshire RG23 8JQ Full Planning Permission for an existing Temporary 5 Bay Modular Classroom for use by playgroup
15/02427/CC3 BAE063 Merton Infant School, Romsey Close Basingstoke, Hampshire RG24 9HB Variation of condition 11 of planning permission 14/00465/CC3 (pedestrian access and car parking spaces)
15/01658/HCC3N TVE064 Church of England Primary School, East Street, Andover Hampshire SP10 1EP (Listed Building Application) Conversion of an external store building into a boiler room to serve a new heating system in the main school building
23423/011 EHE049 Andrews Endowed C of E Primary School, 92 London Road, Holybourne Alton GU34 4EL (Listed Building Application) The proposed works involve the repair and conservation works of the following: Internal plaster works, External render works, Window and door replacement works, New injection DPC, Install new ACO drainage
P/15/0682/CC FAE013 Henry Cort Community College, Henry Cort Drive, Fareham PO15 6PH The proposal is to reclad the College's Thackeray Block and provide 2 No double modular classrooms for the duration of the project to enable this work to be undertaken
20103/004 EHE046 Clanfield Early Years - Petersgate Infant School, Green Lane, Clanfield Waterlooville Hants, PO8 0JU 3 bay extension to a temporary modular nursery building
24399/009 EHE005 Rowledge C of E First School, School Road, Rowledge, Farnham GU10 4BW Provision of a prefabricated steel-framed canopy to provide all weather external play facility for Reception year
P/15/0588/CC FAE004 Brookfield School, Brook Lane, Sarisbury Green, Fareham SO31 7DU Small extension to the existing Performing Arts Block of a multi-teaching space and single classroom with toilet and storage facilities
SCR/2015/0319 BA125 Basingstoke Sewage Treatment Works EIA Screening Opinion: Enhanced sludge digestion
15/01541/HCC3S TVE019 North Baddesley County Infant School, Botley Road, North Baddesley, Hampshire SO52 9EE Temporary Single Modular Classroom
15/01367/HCC3N TVE022 Hurstbourne Tarrant Church of England Primary School, Church Street, Hurstbourne Tarrant Hampshire SP11 0AX Replacement of existing single temporary modular classroom with another single temporary modular classroom
15/01953/CC3 BAE049 North Waltham Primary School, Church Road, North Waltham Hampshire RG25 2BL (Listed Building Application) Careful dismantling and rebuilding of defective chimney stack
S/15/76521 EAR003 Netley Chapel, Royal Victoria Country Park, Netley Abbey, Hampshire SO31 5GA (Listed Builiding Application) The proposed works include, repair and conservation works to the chapel, demolition of modern unsympathetic additions, a series of internal alterations to improve access for visitors and a new build extension to provide the necessary ancillary facilities for the running of the chapel
15/00877/HCC HRG010 Wyndhams Pool, Cricket Hill Lane Yateley Hampshire GU46 6BB Repairs to Wyndham's Dam at Wyndham's Pool - within an SSSI
15/01355/HCC HRG011 Basingstoke Canal and towing path, Near Dower House, Church Lane, Dogmersfield RG27 8TA Restoration of the Basingstoke Canal channel and towpath following a landslide including engineering work to prevent further slips from occurring
P/15/0538/CC FAE033 Red Barn County Primary School, Linden Lea, Fareham Hampshire PO16 8HJ One single temporary modular classroom, one single modular community room plus a new bin store
S/15/76115 EA027 Netley Farm Landfill, Old Portsmouth Road, Bursledon Hampshire SO31 8GD Remediation of settlement of former Netley Landfill involving importation and screening of subsoils
15/01922/CC3 BAE029 Maple Ridge School, Maple Crescent, Basingstoke, Hampshire RG21 5SX Temporary double modular classroom
15/01014/HCS WRE006 The Westgate School, Cheriton Road, Winchester, Hampshire SO22 5AZ Tarmac play surface 29.350M x 10.680M and a 1.2m wide path, Play surface to have 1.5 m high Chain link fence with gates
<- 1 | 2 | 3 ->